DIRECTIONS FOR USE:

NEW POOL START-UP

  1. Ensure pool water is balanced to recommended parameters. If not within range, adjust as needed: Alkalinity: 80-120 ppm pH: 7.4-7.6 Calcium Hardness: 200-400 ppm

  2. As pool is filling (with water covering the entire surface of the base of the pool), add 64 oz per 20,000 gallons of pool water. Take care not to splash product on pool surfaces that are not yet covered with water.

  3. Continue with new pool start-up recommendations from the manufacturer of your pool finish that include (but are not limited to): brushing pool surface, brushing any plaster dust that may remain, keeping water in balance throughout the start -up process.